Partek

Solitare Automotive Audi Terminal Building

The project comprised of a 1180m2 single storey Audi showroom with a mezzanine floor for Solitaire Automotive.

With its striking, folded honeycomb-pattern brushed aluminium façade, the new ‘Terminal Building’ clearly reflects Audi’s global architecture which is gaining momentum across Australia.

The design of the showroom complied with the Audi corporate brand and was consistent with all the Audi Terminal buildings globally.

The lower level of the building consisted of the showroom, offices, WC and handover bay. The mezzanine housed more offices, boardroom, meeting room, staff amenities and a large open area which looked out over the showroom floor.

The components of this building which make it unique include the external aluminium cladding which is exclusive to Audi and the large curved raking walls located in the showroom which are inspired by the Nurburgring, a motorsport complex in Germany. The Barrisol stretch ceiling linings and the butzbach door in the handover bay on the lower level are also features worth mentioning.

The project was delivered within the client requested compressed programme.

Client

Audi

Architect

Walter Brooke Architects

Location

Hawthorn

Project Type

General Construction

Download case study
Previous

Previous

Next

Next

Woolworths Caltex Petrol Station Goolwa

Architect: Brown Falconer

Partek

St Michael’s College Senior Learning Centre & Maintenance Building

Architect: Edge Architects

Partek

Chiton Rocks Surf Life Saving Redevelopment

Architect: Intro Design

Partek

Investigator College Senior School Building

Architect: Flight Path Architects

Partek

Solitare Automotive Audi Terminal Building

Architect: Walter Brooke Architects

Partek

Tranmere Development

Architect: ADS Architects and MPH Architects

Partek

Pulteney Grammar School, Centre for Senior Learning

Architect: Walter Brooke Architects

Partek

Sacred Heart College – Home Economics Suite

Architect: Hames Sharley

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek