Tranmere Development

This was a project that had everything. In summary we have constructed a mixed use development comprising of a 2 storey commercial office building with both basement and under croft car parking, office fitouts for two state government departments and construction of a new fuel station including fast food outlets and a standalone automated car wash.

Partek were engaged at an early stage to provide a professional service in value adding to the design development and provided constructability advice. This enabled both Partek and the client to fast track the tender process which was tendered in stages to enable works to commence on site at a far earlier stage than a typical project.

A main challenge for our team was the method by which the project was procured. The contracts were divided into 3 parts ie. base building and fitouts for SA Health and Service SA. Due to this contractual arrangement our team administered and coordinated 3 different contracts for different clients working in collaboration with 2 different design consultant teams.

The project as a whole was completed on time, within budget with all 3 clients very happy with the outcome.

Client

Various

Architect

ADS Architects and MPH Architects

Location

Tranmere

Project Type

General Construction

Download case study
Previous

Previous

Next

Next

Blair Athol Childcare Centre

Architect: Brown Falconer

Partek

St Michael’s College Senior Learning Centre & Maintenance Building

Architect: Edge Architects

Partek

Adelaide Paediatrics Mile End

Architect: Woods Bagot

Partek

All Saints Catholic School Redevelopment

Architect: Peter Moeck Architect

Partek

Kilburn Childcare Centre

Architect: Mammoth Projects

Partek

Royal Adelaide Golf Club

Architect: Grieve Gillett

Partek

Investigator College Senior School Building

Architect: Flight Path Architects

Partek

HAMBS Fitout

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek