Partek have recently commenced construction of a new petrol filling station and shop building for Woolworths Limited on a 2284m² greenfield site on Beach Road in Goolwa.

The scope works involve carrying out earthworks and site remediation works, construction of a new 80m² shop building and canopy structure, forecourt pavements, parking spaces, drainage systems, construction of corporate signage, new kerbing, islands and landscaping of the site. Partek are also responsible for the installation of services, connections and commissioning and the co-ordination of the fuel system installation with Woolworth’s separate contractors and associated suppliers.

Partek Industries have been contracted by Burnside War Memorial Hospital to undertake the task of installing new diesel generators which when complete will provide all areas of the Hospital with power / lighting in the event of a power failure.

Partek have recently commenced construction of the Northpoint Toyota vehicle dealership & showroom on Main North Road, Prospect. The project involves the demolition of the existing buildings & carparking and the construction of a new 2 story showroom and office building with associated staging area, service drop-off, carparking and external display area.

The new dealership incorporates a double height vehicle showroom at the front of the building with offices & amenities housing the sales & services teams on the ground floor & mezzanine level. The building is to be clad with a full height glass façade facing Main North Road and aluminium louvres spanning the South-East elevation as well as Alucobond cladding and precast wall panels to the remaining of the exterior. The large undercover service drop off area will feature a perforated corrugated ceiling lining and structural steel columns clad in folded Alucobond.

Externally, the high profile corner site (adjacent a local park) will be complimented with new driveways, carparking and external vehicle display with some minor landscaping works.

Partek have recently commenced the redevelopment of the Chiton Rocks Surf Life Saving Club in Hayborough, Victor Harbor. Situated in the sand dunes of Chiton Beach with only the train line separating itself from the surf, the clubhouse upgrade comprises of a new two storey extension as well as refurbishing the interior & exterior of the existing building.

The construction of the new two storey extension will flow on seamlessly from the existing building via the connection of a large new balcony/deck on the first floor overlooking the beach and new courtyard, paving & landscaping on the ground level.

Internally, the new layout will facilitate everything required to operate a successful surf club such as a boat shed, changerooms, first aid, gym & training facilities . The members and general public will also be treated with the addition of a brand new open plan recreation room and dining area upstairs boasting the ‘million dollar’ views along with a new commercial kitchen & bar area.

Partek faces many challenges ahead with this build mainly associated with the upgrade of the existing building where the Surf Life Savers have been patrolling the beach for 60 years, the existing asbestos roof is being replaced with a new roof to connect with the new extension, along with structural remediation works and façade upgrades throughout.

A vast array of materials & finishes will be utilised throughout the build; featuring Alucobond & Modwood cladding on the outside, and recycled timber from the old balcony used in the bar area.

Partek have recently commenced an exciting redevelopment for the The Uniting Church of Australia by refurbishing the Uniting College facility on Sir Donald Bradman Drive, Brooklyn Park.

The project will see all of the College’s theological learning, library and administrative functions and spaces move from their existing location on the site to a mostly unused old school building.

Partek are working with Hodgkison Architects who designed the facility as part of a broader site master plan. The design includes a significant overhaul of the old building, starting with the opening up and clearing out of all spaces over two levels. A contemporary new fit-out will take the place of dated décor, with inter-connected learning spaces, bright new offices, and overlapping student hubs featuring prominently.

Partek have recently commenced construction of the Blair Athol Child Care Centre located on Prospect Road. The project involves the demolition of 3 existing residential dwellings and construction of a new 128 place childcare centre.

The centre will cater for children from nursery age through to pre-school age and includes associated back of house services including a laundry, kitchen, toilets and staff amenities.

The site will also boast impressive external works including a new carpark, signage, outdoor undercover areas and a full landscape delivery.

Sitting on a high exposure corner allotment on the in-track towards the CBD, Partek is primed to deliver a centre striving to be a prominent childcare facility for the inner northern region.

In partnership with Edge Architects, Partek has commenced construction of the new Senior Learning Centre and Maintenance Building at Saint Michael’s College (Secondary Campus). The new Maintenance Building will be constructed in the existing student carpark. With a footprint of 440 square metres, this is substantially larger than the existing Maintenance Shed which will be demolished to make way for the new Senior Learning Centre (SLC). The SLC will be a state of the art two-storey building which will include 13 new general learning areas, a lecture theatre, hospitality areas, staff offices, IT classrooms and a café. Adjacent to the existing oval, the facility delivers new changing rooms, carparking and landscaped outdoor gathering and learning spaces.

The facility is modelled on a university hub design which provides flexible leaning spaces that will cater for group and individual learning. The Senior Learning Centre will enable increased capacity at the Secondary Campus, providing additional room for the readiness of Year 7’s joining the campus in 2019.

Partek have recently commenced refurbishing the Adelaide Paediatrics Head Office at Mile End which is really starting to take shape. In close collaboration with the client & to make way for the refurbishment of the Main Building, Partek successfully relocated the Adelaide Paediatrics staff and the associated furniture/equipment by mirroring the existing large paediatric consult rooms and reception into temporary transportable modules and toilets.

To achieve this, Partek worked closely with the client to ensure they could continue their operating onsite whilst satisfying all their operation’s needs. Partek have also mapped out a staging plan with Adelaide Paediatrics to move them back into the main building prior to practical completion of the project. The main building consists of two levels with a new extension on the ground floor to allow for the installation of lift services. The refurbishment will boast a stunning upgrade in building quality consisting of high end building finishes, services and loose furniture & equipment.